× nl Switch to Dutch en Switch to English

News

ISO27001 and NEN7510 certified

Thursday 3 May 2018

Our ISO certificate is just in. InterDC and InterRacks are information security compliant with the ISO27001 and NEN 7510 certificate!

NDIX pop in InterDC

Tuesday 17 April 2018

Connectivity is in this time more and more important. We can proudly announce that NDIX has a pop location (point of presence) in our datacenter.
Order your NDIX vlan today!

Start ISO27001 certification

Thursday 30 November 2017

Early this year we started to prepare our company for the ISO27001 and NEN7510 certifications.
Last Tuesday we had our first external audit by Dekra. We passed the first audit and we are ready for the second Audit which is taking place in January 2018!

Emergency power generator maintenance

Monday 6 November 2017

Every year our emergency power generator has to be inspected and maintained.
This year the maintenance went fine and the generator is standing by for a potential power failure.

Racks are the same color now

Wednesday 27 September 2017

We had a few white racks on our data-floor while most of our racks are black. So we decided to replace the few white racks. The change wasn't needed for the consistent color, but the new racks have an higher degree of perforation allowing an better airflow for the servers.

AC #1 maintenance

Wednesday 6 September 2017

AC unit 1 had big maintenance, the compressor needed to be replaced. This component is the heart of the AC unit since this part keeps the liquid flowing in the installation so that it can transport the heat to the outside.
The maintenance was a success and AC 1 is running again.

UPS maintenance

Wednesday 16 August 2017

Our UPS had his first big maintenance. In this maintenance window the bypass of the ups was replaced.
The ups was offline for a few hours. Before the maintenance we started our emergency power generator for backup power. So if there is a power outage, our generator is already stared and can take over immediately without power loss to our data floor.

Preparation of the 10/40gbit network

Thursday 29 June 2017

The demanding grow for more internet traffic leads us to invest in high speed network equipment like the 10/40gbit network switches of Arista.
These new switches will be in production soon to keep up with these demands.

UPS upgrade

Thursday 1 September 2016

After the expansion of a larger power connection we also needed to expand our UPS.
Luckily our UPS is modular and the Eaton engineers can easy slide an extra module in the UPS.
Our new UPS power capacity is 120kW or 80kW N+1.

Datacenter Enschede
  • InterDC Enschede Haven
  • Josinkstraat 30
  • 7547AB Enschede
  • The Netherlands
Datacenter Enschede
  • InterDC Enschede Marssteden
  • Marssteden 110
  • 7547TD Enschede
  • The Netherlands
Datacenter Hengelo
  • InterDC Hengelo
  • Sherwood Rangers 1
  • 7551KW Hengelo
  • The Netherlands
Datacenter Doetinchem
  • InterDC Doetinchem
  • Gildenbroederslaan 1
  • 7005BM Doetinchem
  • The Netherlands